Pipe jacking

This technology is suitable when installing new engineering communications via short distances (up to 20 meters) with minimal digging into the ground.

After preparing the starting and ending holes we prepare a closed pathway under the roads, pavements, trees or other small obstacles. Following the installation of an underground tunnel of an appropriate size a polythene tube is installed.

Arrow-Horizontal

max length* = 20 m

 
 
Arrow-vertical

Max depth* = 2 m

 
 
 
diameter
Max diameter = 63 mm
Horizontalus valdomas kryptinis gręžimas

For more information and services please contact us by phone: +370 660 63 000 or email: info@drilingas.lt